• DocumentCode
    169579
  • Title

    Solving resource-constrained project scheduling problem by genetic algorithm

  • Author

    Kadam, Sachin U. ; Kadam, Narendra S.

  • Author_Institution
    Dept. of Comp. Sci. &Eng., RIT-Islampur, Sangli, India
  • fYear
    2014
  • fDate
    9-11 Jan. 2014
  • Firstpage
    159
  • Lastpage
    164
  • Abstract
    This paper proposes a genetic algorithm to solve resource constrained project scheduling problem, in which resources are optimally allocated to tasks. Resources are renewable. In RCPSP each activity is executing in single mode. This work employed genetic algorithm to schedule project task to minimize makespan respect to resource constraint and precedence constraint. The Schedule Generation Scheme was used to decode project plan. The approach was tested on a set of standard problem obtained from Project Scheduling Problem Library (PSLIB) and algorithm given in this paper was compared with the existing optimization algorithm, the result reveals that the algorithm is effective for the RCPSP.
  • Keywords
    genetic algorithms; resource allocation; scheduling; task analysis; PSLIB; RCPSP; genetic algorithm; project scheduling problem library; project task; resource allocation; resource-constrained project scheduling problem; Computational modeling; Generators; Genetics; Scheduling; Search problems; Sociology; Statistics; Genetic Algorithm; Project Scheduling; Resource Constrain;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Business and Information Management (ICBIM), 2014 2nd International Conference on
  • Conference_Location
    Durgapur
  • Print_ISBN
    978-1-4799-3263-4
  • Type

    conf

  • DOI
    10.1109/ICBIM.2014.6970966
  • Filename
    6970966