DocumentCode :
1701490
Title :
Optimisation of the Sizewell B Alarm System
Author :
Broadhead, N.
Author_Institution :
Nucl. Electr. Ltd., Gloucester, UK
fYear :
1997
fDate :
6/17/1997 12:00:00 AM
Firstpage :
42461
Lastpage :
42465
Abstract :
The Sizewell B Main Control Room (MCR) uses an integrated system for centralised operation, known as WISCO. This is a large distributed computer system made up of three subsystems: the high integrity control system, the process control system, which are control and data acquisition systems; and the distributed computer system (DCS) which is a data processing and display system. The DCS provides the principle source of plant and alarm information via VDU displays, but it is supported by independent indications and alarm facias for nuclear safety purposes. This paper discusses the experience gained with optimisation of the Sizewell B Alarm System
Keywords :
alarm systems; Sizewell B Alarm System; Sizewell B Main Control Room; VDU displays; WISCO; alarm information; centralised operation; control and data acquisition systems; data processing and display system; high integrity control syste; integrated system; large distributed computer system; nuclear safety; process control system;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Stemming the Alarm Flood (Digest No: 1997/136), IEE Colloquium on
Conference_Location :
London
Type :
conf
DOI :
10.1049/ic:19970742
Filename :
663952
Link To Document :
بازگشت