DocumentCode :
1701673
Title :
FACTS opportunities in England and Wales
Author :
Foss, A.M.
fYear :
1994
fDate :
1/12/1994 12:00:00 AM
Firstpage :
42552
Lastpage :
42559
Abstract :
The privatisation of the electricity supply industry is England and Wales in March 1990 unbundled generation, transmission and distribution. Consequently, the design and operation of the transmission system needs to be sufficiently robust and flexible to accommodate wide variations in the generation pattern. To ensure system security, a number of transmission reinforcements are required. Here, the author describes how FACTS devices offer an alternative to conventional system reinforcement with potential advantages of increased flexibility, lower cost and reduced environmental impact
fLanguage :
English
Publisher :
iet
Conference_Titel :
Flexible AC Transmission Systems (FACTS) - The Key to Increased Utilisation of Power Systems, IEE Colloquium on (Digest No.1994/005)
Conference_Location :
London
Type :
conf
Filename :
280273
Link To Document :
بازگشت