DocumentCode :
1702054
Title :
Too much of a good thing?-alarm management experience in BP Oil. 2. Implementation of alarm management at Grangemouth Refinery
Author :
O´Donnell, M. ; Brown, Donald Campbell
Author_Institution :
BP Oil Grangemouth Refinery, UK
fYear :
1997
fDate :
6/17/1997 12:00:00 AM
Firstpage :
42497
Lastpage :
42499
Abstract :
This paper reports on the BP trial of the ProSys Dynamic Configuration Software at Grangemouth Refinery. Key elements of this project to reduce alarm flooding on the catalytic reformer are described, from identification of the problem and process/operations design, through applications design and implementation, to testing and commissioning. The impact of the software is demonstrated, using data captured from real plant trips
Keywords :
alarm systems; BP Oil; Grangemouth Refinery; ProSys Dynamic Configuration Software; alarm flooding; alarm management; alarm management experience; applications design; catalytic reformer; commissioning; process/operations design; testing;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Stemming the Alarm Flood (Digest No: 1997/136), IEE Colloquium on
Conference_Location :
London
Type :
conf
DOI :
10.1049/ic:19970744
Filename :
663954
Link To Document :
بازگشت