Title :
Too much of a good thing?-alarm management experience in BP Oil. 2. Implementation of alarm management at Grangemouth Refinery
Author :
O´Donnell, M. ; Brown, Donald Campbell
Author_Institution :
BP Oil Grangemouth Refinery, UK
fDate :
6/17/1997 12:00:00 AM
Abstract :
This paper reports on the BP trial of the ProSys Dynamic Configuration Software at Grangemouth Refinery. Key elements of this project to reduce alarm flooding on the catalytic reformer are described, from identification of the problem and process/operations design, through applications design and implementation, to testing and commissioning. The impact of the software is demonstrated, using data captured from real plant trips
Keywords :
alarm systems; BP Oil; Grangemouth Refinery; ProSys Dynamic Configuration Software; alarm flooding; alarm management; alarm management experience; applications design; catalytic reformer; commissioning; process/operations design; testing;
Conference_Titel :
Stemming the Alarm Flood (Digest No: 1997/136), IEE Colloquium on
Conference_Location :
London
DOI :
10.1049/ic:19970744