Title :
Demonstrate cost savings, schedule shortenings, etc [software project management]
Author :
Buitenkant, Peter
Author_Institution :
24 Thorngrove Lane, Dix Hills, NY, USA
Abstract :
We examine some very specific ways in which a client can realize very dramatic savings, both in schedule and project costs. Bringing in outside resources can either shorten your normal design/development cycle or solve a particularly vexing problem. This allows you, the client to benefit from 4 important considerations: fresh approach by outsider; individual highly skilled in the area of interest; specialised equipment is often made available to the client at little or no cost; and highly motivated to satisfy you, the client
Keywords :
project management; software development management; cost savings; design/development cycle; outside resources; schedule shortenings; software project management; vexing problem;
Conference_Titel :
ELECTRO '96. Professional Program. Proceedings.
Conference_Location :
Somerset, NJ
Print_ISBN :
0-7803-3271-7
DOI :
10.1109/ELECTR.1996.501206