DocumentCode
1709981
Title
Scheduling method for steelmaking and continuous casting production process and its application
Author
Yu Shengping ; Pang Xinfu
Author_Institution
Key Lab. of Process Ind. Autom. of Minist. of Educ., Northeastern Univ., Shenyang, China
fYear
2013
Firstpage
2420
Lastpage
2425
Abstract
The intelligent method, programming method, human-computer interaction method are proposed for complex production, multi-device, randomness, and uncertainty in the steelmaking and continuous casting production process. The scheduling system for steelmaking and continuous casting was developed on the basis of studying scheduling strategy. The system integrates plan making, local plan adjusting, completely rescheduling and human-computer interaction. The system is applied to one large steel plant. Results show that the system can efficiently reduce dynamic scheduling time, short redundant waiting time for molten steel and raise the load ratio of facilities.
Keywords
casting; dynamic scheduling; facilities planning; human computer interaction; industrial plants; production engineering computing; steel industry; steel manufacture; complete rescheduling; complex production; continuous casting production process; dynamic scheduling time reduction; facility load ratio; human-computer interaction method; intelligent method; large steel plant; local plan adjusting; molten steel; multidevice; plan making; programming method; randomness; scheduling method; scheduling strategy; scheduling system; short redundant waiting time; steelmaking process; uncertainty; Casting; Electronic mail; Human computer interaction; Job shop scheduling; Laboratories; Steel; Human-computer Interaction; Production Scheduling; Rescheduling; Steelmaking and Continuous Casting;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (CCC), 2013 32nd Chinese
Conference_Location
Xi´an
Type
conf
Filename
6639833
Link To Document