DocumentCode :
1712316
Title :
Experiment study on the rubber and fly ash of modified asphalt
Author :
Wei, Zhang ; Chengqin, Chen
Author_Institution :
Key Lab. for Special Area Highway Eng. of Minist. of Educ., Chang´an Univ., Xi´an, China
Volume :
4
fYear :
2011
Firstpage :
2971
Lastpage :
2974
Abstract :
This paper mainly used rubber and fly ash to modify matrix asphalt, expecting to get the reasonable rubber dosage and fly ash. The production technology of rubber asphalt, including cutting temperature, cutting time, production process, was determined by the laboratory experiment at different craft conditions according to rubber asphalt performance; The effects of different rubber particle size, dosage and fly ash dosage for modified asphalt penetration, low-temperature ductility, softening point and elastic restitution were analyzed to determine rubber particle size, optimal rubber dosage and fly ash dosage. They will affect the modified asphalt performance.
Keywords :
asphalt; fly ash; road building; rubber; cutting temperature; cutting time; fly ash; matrix asphalt; production process; rubber asphalt; Ash; Asphalt; Indexes; Rubber; Softening; fly ash; modified asphalt; road engineering; rubber;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Water Resource and Environmental Protection (ISWREP), 2011 International Symposium on
Conference_Location :
Xi´an
Print_ISBN :
978-1-61284-339-1
Type :
conf
DOI :
10.1109/ISWREP.2011.5893501
Filename :
5893501
Link To Document :
بازگشت