• DocumentCode
    1716289
  • Title

    A rail-transit people-mover headway comparison

  • Author

    Auer, John H., Jr.

  • Author_Institution
    General Railway Signal Company, Rochester, New York
  • Volume
    28
  • fYear
    1978
  • Firstpage
    452
  • Lastpage
    458
  • Abstract
    For many years, GRS has supplied control systems for conventional rail transit. Headways for these systems range from minutes or hours to as low as 75 seconds, In the last few years, the company has supplied control systems for people-mover applications in which minimum headways of 10 to 20 seconds have been achieved. The 75-second design headway of a model Conventional Rail Transit (CRT) system is compared with the 18-second design headway of a model Automated Guideway Transit (AGT) system from the viewpoint of potential for reduced CRT headway. It is shown that the major CRT factors responsible for this headway difference are on-line stations, train length and Safe Braking Distance. These factors are evaluated and discussed. It is concluded that a large increase in CRT track capacity should not be expected from the transfer of control technology from AGT.
  • Keywords
    Cathode ray tubes; Circuits; Cities and towns; Control systems; Costs; Engineering management; Rail transportation; Railway engineering; Throughput; Vehicle detection;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Vehicular Technology Conference, 1978. 28th IEEE
  • Type

    conf

  • DOI
    10.1109/VTC.1978.1622580
  • Filename
    1622580