    The decision about the nominal power of each substation transformer is made based on the peak load value and in the contingency criteria during emergency situations. As emergency criteria, some facilities in Brazil consider that when one transformer is disconnected, the other ones in the same substation need to supply the total load. Others facilities consider that a substation can assume an amount of extra load, up to 30% of its total load from other substations. In both cases, the overload on each transformer must not exceed 20%.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 2005. CIRED 2005. 18th International Conference and Exhibition on
  • Conference_Location
    Turin, Italy
  • Type

    conf

  • Filename
    5427762