DocumentCode
1721631
Title
Modeling start-up times in unit commitment by limiting temperature increase and heating
Author
Huber, Matthias ; Silbernagl, Matthias
Author_Institution
Technische Universität München, Munich, Germany
fYear
2015
Firstpage
1
Lastpage
5
Abstract
The integration of variable renewable energy sources leads to an increased cycling of conventional power plants, necessitating a detailed model of the start-up process. Based on the recently developed temperature formulation for startup costs in Unit Commitment, we model the off-time-dependent start-up times of thermal units by limiting temperature increase and heating. Numerical results indicate that limiting heating speed is more efficient and leads only to a moderate increase in computational time.
Keywords
Computational modeling; Cooling; Heating; Limiting; Numerical models; Power generation; Production; Integration of Renewables; Power Plant Temperatures; Start-up Times; Unit Commitment;
fLanguage
English
Publisher
ieee
Conference_Titel
European Energy Market (EEM), 2015 12th International Conference on the
Conference_Location
Lisbon, Portugal
Type
conf
DOI
10.1109/EEM.2015.7216755
Filename
7216755
Link To Document