• DocumentCode
    1721865
  • Title

    Comparative study of project management models from the perspective of property owner

  • Author

    Feixue, Yang ; Zhenhua, Song

  • Author_Institution
    Sch. of Manage., Tianjin Univ. of Technol., Tianjin, China
  • Volume
    2
  • fYear
    2010
  • Abstract
    While faced with a variety of project management models, property owners should how to select a suitable project management model to ensure quality, schedule control, and enhance project benefits. In this paper, traditional project management model (Desing-Bid-Bulid) and CM model are individually compared with DB model after these three kinds of project management models are briefly introduced. At present, it is considered that in comparison with the other two models DB model is with obvious advantages. But the owners must also consider its own conditions and project features while choosing the most suitable project management model.
  • Keywords
    construction industry; project management; property market; quality management; CM model; construction-management model; project benefits; project features; project management model; property owner; quality management; schedule control; Analytical models; Biological system modeling; Construction industry; Contracts; Investments; Organizations; Project management; CM Model; DB Model; DBB Model; Project Management Model; Property Owners (Owners Enterprises);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Signal Processing Systems (ICSPS), 2010 2nd International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-6892-8
  • Electronic_ISBN
    978-1-4244-6893-5
  • Type

    conf

  • DOI
    10.1109/ICSPS.2010.5555785
  • Filename
    5555785