• DocumentCode
    1725683
  • Title

    Installation and testing of the signalling system

  • Author

    Marriott, D

  • Author_Institution
    Network Rail, UK
  • fYear
    2010
  • Firstpage
    175
  • Lastpage
    187
  • Abstract
    Testing is a developing science. As technology moves on, the techniques employed will need to change. The basic requirement remains the same. We do not possess the ability to take a system apart, to examine it minutely for a defect that might lead to incidents or reliability problems later. Therefore, a sufficiently robust series of iterative tests is required. Iterative tests that will guarantee that an installation has been designed and installed to a standard that is both safe and fit for purpose.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Signalling and Control Systems (RSCS 2010), IET Professional Development Course on
  • Conference_Location
    Birmingham, UK
  • Type

    conf

  • DOI
    10.1049/ic.2010.0098
  • Filename
    5556157