• DocumentCode
    1725913
  • Title

    A railway for operators

  • Author

    Glover, John

  • Author_Institution
    The Institution of Railway Operators, UK
  • fYear
    2010
  • Firstpage
    79
  • Lastpage
    85
  • Abstract
    This paper traces briefly early railway history, continuing with a discussion of capacity as one of the most intractable of the present problems. It examines timetabling as a function of railway operation and how this is can be carried out effectively to the benefit of all concerned. Suggestions are then made as to what operators are looking for, and how this can be aligned with the needs of customers and the industry alike.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Signalling and Control Systems (RSCS 2010), IET Professional Development Course on
  • Conference_Location
    Birmingham, UK
  • Type

    conf

  • DOI
    10.1049/ic.2010.0090
  • Filename
    5556165