• DocumentCode
    1726166
  • Title

    Quality planning for software development

  • Author

    Walton, Tom

  • fYear
    2001
  • fDate
    6/23/1905 12:00:00 AM
  • Firstpage
    104
  • Lastpage
    109
  • Abstract
    A historical project is used as a reference model for the verification planning process. The planning equations and an example are presented. The example objective set is to increase the level of defect removal from the final software from the historical level of 35% to about 88% of the defects introduced into the code and to reduce the overall number of delivered defects/KLOC by 85%. The example illustrates the methods used to estimate the phase-by-phase effort required to achieve the specified goal. The use of the planning model and the resulting data in day-to-day activities is also discussed
  • Keywords
    software engineering; software quality; defect removal phase-hy-phase effort; example objective set; planning equations; quality planning; reference model; software development; verification planning process; Documentation; Equations; Inspection; Phase estimation; Process planning; Programming; Resource management; Software testing; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Software and Applications Conference, 2001. COMPSAC 2001. 25th Annual International
  • Conference_Location
    Chicago, IL
  • ISSN
    0730-3157
  • Print_ISBN
    0-7695-1372-7
  • Type

    conf

  • DOI
    10.1109/CMPSAC.2001.960604
  • Filename
    960604