• DocumentCode
    1728249
  • Title

    Implementation of a maintenance proficiency testing program at the Calvert Cliffs Nuclear Power Plant

  • Author

    Price, Wally

  • Author_Institution
    Baltimore Gas & Electr., Lusby, MD, USA
  • fYear
    1992
  • Firstpage
    410
  • Lastpage
    412
  • Abstract
    The Calvert Cliffs Nuclear Power Plant recognized a need for a method of evaluating maintenance personnel. Assessing the proficiency levels of personnel required the establishment of an objective, reliable, time-saving, and valid system to evaluate competency. Concurrently, the Electric Power Research Institute (EPRI) had pioneered a process to develop proficiency assessment tests. A cooperative effort was undertaken. The development of proficiency assessment testing of maintenance personnel was performed in a joint effort between Baltimore Gas & Electric and EPRI.<>
  • Keywords
    nuclear power stations; nuclear reactor maintenance; personnel; Baltimore Gas & Electric; Calvert Cliffs Nuclear Power Plant; EPRI; Electric Power Research Institute; maintenance proficiency testing program; Automatic testing; Contracts; Maintenance; Materials testing; On the job training; Performance evaluation; Personnel; Power generation; Power system reliability; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Human Factors and Power Plants, 1992., Conference Record for 1992 IEEE Fifth Conference on
  • Conference_Location
    Monterey, CA, USA
  • Print_ISBN
    0-7803-0888-3
  • Type

    conf

  • DOI
    10.1109/HFPP.1992.283374
  • Filename
    283374