Title :
Lessons/experience learned from the Boston Edison Company control room enhancement project
Author :
Eisenmann, Norman R. ; Beith, Danna M. ; Shawver, Diane W.
Author_Institution :
Boston Edison Co., Boston, MA, USA
Abstract :
The Boston Edison Company implemented the first phase of a control room enhancement project at the Pilgrim Nuclear Power Station. The project consists of several tasks, such as control panel painting, control panel relabeling, an upgrade of the control room lighting, etc. These tasks implemented the corrective actions identified during one of the Three Mile Island (TMI)-related activities, i.e., the detailed control room design review (DCRDR). The control panel relabeling and painting tasks and the control room lighting upgrade are described. Issues that were identified in the implementation of these enhancements as well as lessons learned from these projects are discussed.<>
Keywords :
control facilities; nuclear power stations; power station computer control; Boston Edison Company; Pilgrim Nuclear Power Station; control panel painting; control panel relabeling; control room design review; control room enhancement project; control room lighting; Control systems; Design engineering; Hardware; Human factors; Labeling; Lighting control; Painting; Power generation; Switches; Systems engineering and theory;
Conference_Titel :
Human Factors and Power Plants, 1992., Conference Record for 1992 IEEE Fifth Conference on
Conference_Location :
Monterey, CA, USA
Print_ISBN :
0-7803-0888-3
DOI :
10.1109/HFPP.1992.283394