DocumentCode
1741100
Title
The integrated design of EMS and its practice in Guangdong Power Control Center
Author
Zhendong, Jin ; Shitao, Mao ; Qianchang, Cheng
Author_Institution
Nanjing Autom. Res. Inst., China
Volume
1
fYear
2000
fDate
2000
Firstpage
515
Abstract
Based on the current situation of EMS/SCADA system in China and the trend of integration of EMS with other new functions, the integrated EMS SD6000T is designed. This paper describes the design principle and development of integrated EMS and its practice in Guangdong Power Company
Keywords
SCADA systems; control system synthesis; energy management systems; power system control; China; EMS SD6000T; EMS integrated design; EMS/SCADA system; Guangdong Power Control Center; design principle; Computer integrated manufacturing; Computer networks; Database systems; Design automation; Graphics; Medical services; Power control; Power system security; Real time systems; SCADA systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Technology, 2000. Proceedings. PowerCon 2000. International Conference on
Conference_Location
Perth, WA
Print_ISBN
0-7803-6338-8
Type
conf
DOI
10.1109/ICPST.2000.900110
Filename
900110
Link To Document