• DocumentCode
    1743826
  • Title

    Customer demand satisfaction in production systems: a due-time performance approach

  • Author

    Li, Jingshan ; Meerkov, Semyon M.

  • Author_Institution
    Dept. of Electr. Eng. & Comput. Sci., Michigan Univ., Ann Arbor, MI, USA
  • Volume
    1
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    400
  • Abstract
    The problem of customer demand satisfaction in production systems with unreliable machines and finite finished goods buffers is addressed. The measure of customer demand satisfaction, referred to as the due-time performance (DTP), is characterized by the probability to ship to the customer a required number of parts during a fixed time interval. A method for DTP calculation is developed and applied within a case study
  • Keywords
    assembling; goods distribution; probability; production control; customer demand satisfaction; due-time performance approach; finite finished goods buffers; production systems; unreliable machines; Assembly; Automotive engineering; Bismuth; Desktop publishing; Industrial relations; Machinery production industries; Marine vehicles; Production systems; Random variables; Supply chain management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 2000. Proceedings of the 39th IEEE Conference on
  • Conference_Location
    Sydney, NSW
  • ISSN
    0191-2216
  • Print_ISBN
    0-7803-6638-7
  • Type

    conf

  • DOI
    10.1109/CDC.2000.912796
  • Filename
    912796