DocumentCode
1743826
Title
Customer demand satisfaction in production systems: a due-time performance approach
Author
Li, Jingshan ; Meerkov, Semyon M.
Author_Institution
Dept. of Electr. Eng. & Comput. Sci., Michigan Univ., Ann Arbor, MI, USA
Volume
1
fYear
2000
fDate
2000
Firstpage
400
Abstract
The problem of customer demand satisfaction in production systems with unreliable machines and finite finished goods buffers is addressed. The measure of customer demand satisfaction, referred to as the due-time performance (DTP), is characterized by the probability to ship to the customer a required number of parts during a fixed time interval. A method for DTP calculation is developed and applied within a case study
Keywords
assembling; goods distribution; probability; production control; customer demand satisfaction; due-time performance approach; finite finished goods buffers; production systems; unreliable machines; Assembly; Automotive engineering; Bismuth; Desktop publishing; Industrial relations; Machinery production industries; Marine vehicles; Production systems; Random variables; Supply chain management;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control, 2000. Proceedings of the 39th IEEE Conference on
Conference_Location
Sydney, NSW
ISSN
0191-2216
Print_ISBN
0-7803-6638-7
Type
conf
DOI
10.1109/CDC.2000.912796
Filename
912796
Link To Document