System planning to achieve automation of network operation and reduction of operation costs
Author :
Connor, Th. ; Petrossian, E. ; Horn, H.
Author_Institution :
Siemens AG, Germany
Abstract :
Adam Opel AG operates a large factory in Rüsselsheim, Germany. Following the decision in 1997 to close down the 90 MW company-owned power station it was a huge challenge to develop a new network concept for the 20 kV system with an infeed from a public utility. There were major restrictions on time and budgets and the work had to be carried out without causing any disruption to production. This paper describes in detail the design criteria that were employed for the network, the selection of network components and how the project was implemented. Also described are the selection of a neutral earthing scheme suitable for an industrial environment and the earth fault testing that was carried out during implementation of the project. After more than a year of service, there is little doubt that the new network concept is more reliable and more flexible and that overall operating costs have been reduced
Keywords :
costing; industrial power systems; power distribution control; power distribution economics; power distribution planning; project engineering; 20 kV; 90 MW; Adam Opel AG; Germany; design criteria; industrial power distribution system planning; network components selection; operating costs reduction; power network operation automation; project implementation; public utility infeed;
Conference_Titel :
Electricity Distribution, 2001. Part 1: Contributions. CIRED. 16th International Conference and Exhibition on (IEE Conf. Publ No. 482)
Conference_Location :
Amsterdam
Print_ISBN :
0-85296-735-7
DOI :
10.1049/cp:20010875