DocumentCode
1750763
Title
Interactive fuzzy programming for a decentralized two-level transportation planning and work force assignment problem
Author
Sakawa, M. ; Nishizaki, Ichiro ; Uemura, Yoshio
Author_Institution
Grad. Sch. of Eng., Hiroshima Univ., Japan
Volume
1
fYear
2001
fDate
25-28 July 2001
Firstpage
215
Abstract
We deal with a transportation problem in a housing material manufacturer. The housing material manufacturer entrusts transportation of its products to two forwarding agents which handle regular transportation and small lot transportation. There are two objectives of the housing material manufacturer: one is to minimize the transportation cost and the other is to minimize the opportunity loss with respect to transportation time. Each of the two forwarding agents assigns drivers the transportation tasks so as to maximize its profit. We formulate the problem as a decentralized two-level integer programming problem and apply interactive fuzzy programming
Keywords
fuzzy set theory; human resource management; integer programming; planning; resource allocation; transportation; decentralized two-level integer programming problem; driver assignment; forwarding agents; housing material manufacturer; interactive fuzzy programming; opportunity loss; profit maximization; regular transportation; small lot transportation; transportation cost; transportation problem; transportation time; Cost function; Delay effects; Functional programming; Linear programming; Materials requirements planning; Production facilities; Pulp manufacturing; Transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
IFSA World Congress and 20th NAFIPS International Conference, 2001. Joint 9th
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-7078-3
Type
conf
DOI
10.1109/NAFIPS.2001.944254
Filename
944254
Link To Document