• DocumentCode
    1753784
  • Title

    Research on the Selection Method of DC Links Termination at AC Locations

  • Author

    Cai, Heng ; Wu, Su-nong ; Wang, Kang ; Liu, Chong-ru ; Han, Min-xiao

  • Author_Institution
    Jiangxi Electr. Power Res. Inst., Nanchang, China
  • fYear
    2011
  • fDate
    25-28 March 2011
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The main factors are found out for planning DC links terminating at AC system locations from the point of interactions between AC and DC systems, such as Short-Circuit Ratio (SCR), Voltage Static Indicator (VSI), and the power losses of the whole system. Based on the linear weighted summation method for multi-objective decision-making problems, a new method is proposed in this paper to select the stable and economic AC bus as the locations of DC links. By normalizing the factors, and calculating the weighted value, the chosen bus will be the one which both considers the stability and economy. Numeric tests show that the method presented in this paper is effective and feasible.
  • Keywords
    DC power transmission; decision making; AC system locations; DC links termination; linear weighted summation method; multi-objective decision-making problems; selection method; short-circuit ratio; voltage static indicator; HVDC transmission; Indexes; Power system stability; Stability analysis; Thyristors; Voltage control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific
  • Conference_Location
    Wuhan
  • ISSN
    2157-4839
  • Print_ISBN
    978-1-4244-6253-7
  • Type

    conf

  • DOI
    10.1109/APPEEC.2011.5748664
  • Filename
    5748664