Modeling for project scheduling with multi-skilled workforce constraints and uncertainty
Author
Chen Di ; Liu Shi-xin ; Wang Yi-fan
Author_Institution
Coll. of Inf. Sci. & Eng., Northeastern Univ., Shenyang, China
fYear
2014
fDate
May 31 2014-June 2 2014
Firstpage
157
Lastpage
160
Abstract
This paper presents a new workforce allocation optimization model for project scheduling problems with multi-skilled workforce constraints (PSPMSWC), under uncertainty about the projects. The model is a mixed-integer program(MIP) model that aims at maximizing the total profit. As a subproblem, scheduling and staff assignment for projects must also be optimized. In the experiment, projects are selected randomly, and we get the workforce allocation optimal solution as well as workforce assigned optimal strategy by means of CPLEX.
Keywords
human resource management; integer programming; labour resources; scheduling; CPLEX; MIP; PSPMSWC; mixed-integer program; multiskilled workforce constraints; project scheduling; workforce allocation optimization; Educational institutions; Job shop scheduling; Mathematical model; Optimization; Remuneration; Resource management; Uncertainty; Assignment Problem; Multi-skilled Workforce; Project Scheduling; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location
Changsha
Print_ISBN
978-1-4799-3707-3
Type
conf
DOI
10.1109/CCDC.2014.6852136
Filename
6852136
Link To Document