DocumentCode
1754847
Title
Testing nacelles of wind turbines with a hardware in the loop test bench
Author
Helmedag, Alexander ; Isermann, Timo ; Jassmann, Uwe ; Radner, Dominik ; Abel, Dirk ; Jacobs, Georg ; Monti, Antonello
Author_Institution
E.ON Energy Res. Center, RWTH Aachen Univ., Aachen, Germany
Volume
17
Issue
5
fYear
2014
fDate
Oct. 2014
Firstpage
26
Lastpage
33
Abstract
Testing of wind energy converters (WEC) at ground level in contrast to an in-field setup has increased in the last years. As it is an approach which is fundamentally different to in field-testing, it requires significant modifications of the measurement environment and the layout of the sensor system. To increase the reliability of WECs, a detailed investigation of the status of various electrical and mechanical values is necessary because good condition monitoring guarantees a well-controlled state of the turbine in the desired point of operation. This leads to an appropriate maintenance strategy that enhances the lifetime of the WEC. Crucial physical values can be identified easier at ground level testing than with an in-field setup. This article addresses the realization of Hardware in the Loop (HIL) concepts on signal and power level for the use in WEC nacelle testing. Moreover, the functionality of the 1 MW demonstrator test bench operating in HIL mode with a DUT controlled by the original nacelle controller is shown.
Keywords
condition monitoring; maintenance engineering; wind turbines; HIL; WEC nacelle testing; condition monitoring; hardware in the loop test bench; maintenance strategy; measurement environment; nacelle controller; sensor system layout; wind energy converters; wind turbines; Actuators; Aerodynamics; Condition monitoring; Hardware; Load modeling; Sensor systems; Turbines; Wind energy; Wind power generation; Wind turbines;
fLanguage
English
Journal_Title
Instrumentation & Measurement Magazine, IEEE
Publisher
ieee
ISSN
1094-6969
Type
jour
DOI
10.1109/MIM.2014.6912198
Filename
6912198
Link To Document