DocumentCode
1759035
Title
Using Residential AC Load Control in Grid Operations: PG&E´s Ancillary Service Pilot
Author
Sullivan, Michael ; Bode, J. ; Kellow, B. ; Woehleke, S. ; Eto, Joe
Author_Institution
FSC Group, San Francisco, CA, USA
Volume
4
Issue
2
fYear
2013
fDate
41426
Firstpage
1162
Lastpage
1170
Abstract
This paper summarizes the results from a PG&E pilot designed to assess the ability to use air conditioner direct load control to provide ancillary services. The study included nearly 2000 residential households with control devices that were instructed to cause an immediate and complete shutdown of the air conditioner compressor 71 times over a two and half month period. It summarizes the start and total ramp time of AC load response, the magnitude of the response, the effect of the curtailments on customer comfort and satisfaction, and the approach to providing near real time visibility of the air conditioner electricity demand [1].
Keywords
air conditioning; compressors; customer satisfaction; power grids; power system control; PG&E ancillary service pilot; air conditioner compressor; air conditioner direct load control; air conditioner electricity demand; ancillary services; customer comfort; customer satisfaction; grid operations; ramp time; residential AC load control; start time; Air conditioning; Delays; Electricity; Load flow control; Meteorology; Real-time systems; Synchronization; Air conditioner; ancillary services; direct load control; load management; ramp speed; reserves; start time;
fLanguage
English
Journal_Title
Smart Grid, IEEE Transactions on
Publisher
ieee
ISSN
1949-3053
Type
jour
DOI
10.1109/TSG.2012.2233503
Filename
6479719
Link To Document