DocumentCode :
1760547
Title :
Segregating Preventive Maintenance Work for Cycle Time Optimization
Author :
Kalir, Adar A.
Author_Institution :
Intel Corp., Qiriat-Gat, Israel
Volume :
26
Issue :
1
fYear :
2013
fDate :
Feb. 2013
Firstpage :
125
Lastpage :
131
Abstract :
Preventive maintenance (PM) plays an essential role in keeping the equipment in control and performing in the long term in semiconductor manufacturing. However, the impact of this activity on the cycle time of a specific toolset or even the entire fab can be detrimental. Hence, there is a strong incentive for determining the best way to carry out the required PM work content so as to optimize cycle time. In this paper, a model is proposed that optimizes the number and frequency of PMs for a predetermined PM work content, with the consideration of attached setups.
Keywords :
optimisation; preventive maintenance; cycle time optimization; optimize cycle time; preventive maintenance work; semiconductor manufacturing; Approximation methods; Availability; Equations; Maintenance engineering; Mathematical model; Optimization; Workstations; Cycle time; machine variability; optimization; preventive maintenance (PM);
fLanguage :
English
Journal_Title :
Semiconductor Manufacturing, IEEE Transactions on
Publisher :
ieee
ISSN :
0894-6507
Type :
jour
DOI :
10.1109/TSM.2012.2234152
Filename :
6384812
Link To Document :
بازگشت