DocumentCode
176262
Title
Scheduling a constrained hybrid flow shop problem by heuristic algorithm
Author
Yanhui Yu ; Tieke Li
Author_Institution
Sch. of Math. & Stat., Univ. of Northeastern Univ. at Qinhuangdao, Qinhuangdao, China
fYear
2014
fDate
May 31 2014-June 2 2014
Firstpage
2532
Lastpage
2537
Abstract
Due to the closeness between theory and industrial practice, the scheduling problem has been investigated by many experts and practitioners. The mode of continuous casting and hot charge rolling in the steel making is one of the important research areas. Limited buffers and due dates of jobs which characterize the problem here investigated. Based on the analysis from a new angle, a hybrid algorithm, which includes heuristic repairing and neighborhood search, is proposed. In the first phase, jobs are processed by problem dependent heuristic rules. Subsequently, two rules are given to reduce the idle time in buffers of jobs and minimizing the cost of tardiness. Finally, the neighborhood search is performed to improve objectives. From the experiments, the affect of two rules to the results are compared and analyzed. The experiments also show the hybrid algorithm is feasible and effective.
Keywords
casting; flow shop scheduling; hot rolling; search problems; steel manufacture; constrained hybrid flow shop scheduling problem; continuous casting; heuristic algorithm; heuristic repairing; hot charge rolling; job due dates; limited job buffers; neighborhood search; problem dependent heuristic rules; steel making; Algorithm design and analysis; Heating; Heuristic algorithms; Job shop scheduling; Linear programming; Upper bound; Due Dates; Limited Buffers and Heuristic Algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location
Changsha
Print_ISBN
978-1-4799-3707-3
Type
conf
DOI
10.1109/CCDC.2014.6852600
Filename
6852600
Link To Document