DocumentCode
1765240
Title
Improving Product Development Performance Through Iteration Front-Loading
Author
Leon, Hilda C. Martinez ; Farris, Jennifer A. ; Letens, Geert
Author_Institution
Sch. of Bus., Clarkson Univ., Potsdam, NY, USA
Volume
60
Issue
3
fYear
2013
fDate
Aug. 2013
Firstpage
552
Lastpage
565
Abstract
Iteration is a central issue in the management of product development (PD) projects. Iteration is often recognized as a major cause of increased PD lead time and cost, a key driver of schedule risk, and a primary source of uncertainties in the commitment of resources. However, iteration, when planned and managed effectively, can also be used to overcome the uncertainties inherent in interdependent development activities, and to thereby improve and accelerate PD projects. In this paper, we present a methodology that engineering managers can use to identify process architectures which may provide more effectively structured iterations. The methodology determines the suggested process architecture by first eliminating any unbeneficial iterative loops, if they exist, through the application of existing design structure matrix methods, and, then, by front-loading iterations in organizing the other loops through the application of a group formation algorithm. To evaluate the effectiveness of our proposed method, we compare its performance with that of other partitioning and sequencing algorithms also concerned with the ordering of activities within iterative blocks, and also evaluate its performance when used in conjunction with these other algorithms. Specifically, we apply these methods to four examples and use simulation modeling to evaluate the performance of the process architectures suggested by the different methods. Based on the four initial examples, it does appear that our methodology has significant potential to improve the management of PD projects with uncertain iterations by supporting systematic loop pattern explorations and front-loading. Study limitations and areas for future research are also discussed.
Keywords
cost reduction; lead time reduction; product development; project management; PD lead time; PD project management; cost; design structure matrix method; engineering managers; group formation algorithm; interdependent development activities; iteration front-loading; iterative block; partitioning algorithm; process architecture identification; product development performance; resource commitment; schedule risk driver; sequencing algorithm; simulation modeling; structured iterations; systematic loop pattern explorations; unbeneficial iterative loops; Algorithm design and analysis; Computer architecture; Iterative methods; Partitioning algorithms; Planning; Product development; Uncertainty; Design structure matrix (DSM); front-loading; iteration management; process architecture; product development (PD); project performance; simulation;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.2012.2228205
Filename
6392240
Link To Document