DocumentCode :
176661
Title :
Research on the emergence mechanism of Last Planner System of lean construction
Author :
Zhu Kongguo
Author_Institution :
Libr. of Shandong Youth Univ. of Political Sci., Jinan, China
fYear :
2014
fDate :
May 31 2014-June 2 2014
Firstpage :
3643
Lastpage :
3646
Abstract :
The Last Planner System is a very important and systematic method that influences the achievement of lean construction. With the theory of emergence science, this paper analyzed the emergence mechanism of the last planner system from the perspective of group decision-making, information change and self-organization; then, how to realize the potencies of the last planner system so as to attain much emergence was discussed.
Keywords :
construction industry; decision making; lean production; production planning; emergence science; group decision making; information change; last planner system; lean construction; self organization; Decision making; Organizations; Planning; Process control; Production; Project management; Reliability; Complex System; Emergent Property; Group Decision-Making; Last Planner System; Lean Construction;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location :
Changsha
Print_ISBN :
978-1-4799-3707-3
Type :
conf
DOI :
10.1109/CCDC.2014.6852812
Filename :
6852812
Link To Document :
بازگشت