Title :
Production, takt and lead time variation: Production planning and tardiness probabilities in small-lot production
Author :
Kristoffersen, Steinar
Author_Institution :
Moreforsking Molde AS, Molde, Norway
Abstract :
This paper describes the production planning and control processes of two companies, which interact closely in the maritime supply chain. Our claim is that current theoretical models of the near-static tardiness that may be observed are insufficient. We offer an alternative, probability-based approach. This approach and some associated concepts, such as dedicated manufacturing, the accordion effect, the fixed tardiness anomaly and unlucky units may be used by small-lot, high-competencies and value-adding, innovative manufacturers, to revise the manufacturing planning and control approaches.
Keywords :
probability; production control; production planning; supply chain management; control processes; dedicated manufacturing; lead time variation; manufacturing planning; maritime supply chain; near-static tardiness; probability-based approach; production planning; small-lot production; tardiness probabilities; Blades; Companies; Production planning; Propellers; Standards; Supply chains; Takt; bullwhip-effect; co-ordination; production planning and control; purchasing strategies; quality;
Conference_Titel :
Collaboration Technologies and Systems (CTS), 2014 International Conference on
Conference_Location :
Minneapolis, MN
Print_ISBN :
978-1-4799-5157-4
DOI :
10.1109/CTS.2014.6867570