DocumentCode :
1774215
Title :
The analysis of power deploy in holidays
Author :
Ling Wang ; Nvgui Lin ; Ting Huang ; Tianhong Xia ; Yu Dong ; Yixin Chen ; Dongdong Xu
Author_Institution :
FuJian Electr. Power Co., Fuzhou, China
fYear :
2014
fDate :
23-26 Sept. 2014
Firstpage :
350
Lastpage :
353
Abstract :
In this paper, based on the reality that holiday load is in a “trough” segment relative to the annual load curve, we intend to set up a preferential price during the holidays, through economic levers to encourage some industrial enterprises to go into operation in order to achieve the effect of valley filling. We can calculate the preferential price when achieving the target the electricity enterprises expect to fill the valley through the model.
Keywords :
curve fitting; electricity supply industry; industrial power systems; power distribution economics; pricing; electricity enterprises; holiday load; load curve; power deploy; preferential price; valley filling; Abstracts; Automation; Government; Market research; Power demand; Production; Weaving; electricity distribution; holiday; preferential price; valley filling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electricity Distribution (CICED), 2014 China International Conference on
Conference_Location :
Shenzhen
Type :
conf
DOI :
10.1109/CICED.2014.6991727
Filename :
6991727
Link To Document :
بازگشت