Title :
Scheduling optimization of watt-hour meters´ automatic production line based on improved gso method
Author :
Yanjun Fang ; Meng Tang
Author_Institution :
Dept. of Autom., Wuhan Univ., Wuhan, China
fYear :
2014
fDate :
18-20 June 2014
Firstpage :
1045
Lastpage :
1049
Abstract :
An improved artificial glowworm swarm optimization (AGSO) algorithm is proposed to solve the watt-hour meter automatic production line scheduling problem. According to the characteristics of the process in this production line, an encoding and decoding method is designed, which contains producing consequence and equipment selection information. The crowded degree factor, coupled with the cluster and communication behavior are introduced into this algorithm to avoid trapped in local optimum. Meanwhile, we take use of the adaptive step to increase the late convergence of this algorithm. Finally, simulation based on the concrete living example of automatic production line in a watt-hour meter production enterprise is completed. The results obtained by the proposed algorithm are compared with another two optimization algorithms. Analysis shows that the proposed algorithm has the characteristics of fast convergence and optimization of the high rate, so as to prove the effectiveness and robustness of the algorithm.
Keywords :
flow shop scheduling; optimisation; production management; watthour meters; AGSO algorithm; artificial glowworm swarm optimization algorithm; cluster behavior; communication behavior; crowded degree factor; decoding method; encoding method; scheduling optimization; watt-hour meter automatic production line; watt-hour meter production enterprise; Algorithm design and analysis; Clustering algorithms; Convergence; Job shop scheduling; Watthour meters;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control & Automation (ICCA), 11th IEEE International Conference on
Conference_Location :
Taichung
Type :
conf
DOI :
10.1109/ICCA.2014.6871064
Filename :
6871064
Link To Document :
بازگشت