DocumentCode
1792846
Title
Task scheduling for multiple forklift AGVs in distribution warehouses
Author
Giglio, Davide
Author_Institution
Dept. of Inf., Bioeng., Robot. & Syst. Eng., Univ. of Genova, Genoa, Italy
fYear
2014
fDate
16-19 Sept. 2014
Firstpage
1
Lastpage
6
Abstract
Distribution warehouses are considered in this paper with the aim of scheduling the transportation of pallet and roll pallet loads from the storage area to the gates at which the trucks arrive. Transportation activities are carried out by forklift AGVs that can move freely along the warehouse´s aisles (guide paths are not considered). In this paper, an optimization procedure is proposed, which is based on three sequential phases. In the first phase, the number of AGVs to be allocated to each arrived truck is determined; in the second phase, an AGV-to-truck assignment problem is solved; in the third phase, the single tasks are assigned to and sequenced on the AGVs. All phases are based on the formalization and solution of a specific mathematical programming problem, and a heuristic procedure is also proposed to solve a part of the third phase.
Keywords
automatic guided vehicles; mathematical programming; scheduling; transportation; warehouse automation; AGV-to-truck assignment problem; distribution warehouses; mathematical programming problem; multiple forklift AGV; roll pallet loads; task scheduling; transportation scheduling; Buffer storage; Job shop scheduling; Loading; Logic gates; Mathematical programming; Schedules; Transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Emerging Technology and Factory Automation (ETFA), 2014 IEEE
Conference_Location
Barcelona
Type
conf
DOI
10.1109/ETFA.2014.7005360
Filename
7005360
Link To Document