• DocumentCode
    1794586
  • Title

    A two-phase heuristic for full truckload routing and scheduling with split delivery and resource synchronization in public works

  • Author

    Grimault, Axel ; Lehuede, Fabien ; Bostel, Nathalie

  • Author_Institution
    Ecole des Mines de Nantes, LUNAM Univ., Nantes, France
  • fYear
    2014
  • fDate
    5-7 June 2014
  • Firstpage
    57
  • Lastpage
    61
  • Abstract
    This paper presents a two-phase method to solve a routing and scheduling problem that arises in public works. In this problem, the quantity of demands generally exceeds the capacity of a truck. As a result, demands have to be split into full truckloads, taking into account the various capacities in the heterogeneous fleet of vehicles that perform the transportation. Full truckload routes have to be designed and scheduled according to construction or loading constraints on pickup and delivery sites. In the first phase, we propose a linear program to split demands into full truckload requests. The second phase is a heuristic that solves a heterogeneous full truckload pickup and delivery problem with time windows and resource synchronization. The method is evaluated on instances from a real case study.
  • Keywords
    linear programming; scheduling; synchronisation; vehicle routing; construction constraint; full truckload requests; full truckload routing; full truckload scheduling; heterogeneous full truckload pickup-and-delivery problem; heterogeneous vehicle fleet; linear program; loading constraint; public works; resource synchronization; split delivery; time windows; two-phase heuristic method; Asphalt; Concrete; Routing; Synchronization; Vehicles; Zirconium;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Logistics and Operations Management (GOL), 2014 International Conference on
  • Conference_Location
    Rabat
  • Print_ISBN
    978-1-4799-4651-8
  • Type

    conf

  • DOI
    10.1109/GOL.2014.6887418
  • Filename
    6887418