• DocumentCode
    1795308
  • Title

    Trajectory tracking of hard rock tunnel boring machine with cascade control structure

  • Author

    Huajiang Liu ; Jingcheng Wang ; Langwen Zhang ; Guanglei Zhao

  • Author_Institution
    Dept. of Autom., Shanghai Jiao Tong Univ., Shanghai, China
  • fYear
    2014
  • fDate
    8-10 Aug. 2014
  • Firstpage
    2326
  • Lastpage
    2331
  • Abstract
    In this paper, trajectory tracking control of hard rock Tunnel Boring Machine (TBM) is studied with a cascade control structure. The TBM thrust hydraulic system can adjust position and orientation during tunnel excavation. The model of thrust hydraulic system and the compound control technique of thrust hydraulic system are studied. In order to realize trajectory tracking control, the dynamic model of TBM has been researched. The model provides a foundation for the trajectory tracking control of TBM behavior. Position and orientation controller of TBM have been designed and the controller calculates the force of thrust hydraulic system. The compound controller of thrust hydraulic system produces the designed force. The effectiveness of the proposed methods is shown by illustrative example.
  • Keywords
    boring machines; cascade control; construction equipment; control system synthesis; force control; trajectory control; TBM orientation; TBM position; TBM thrust hydraulic system; cascade control structure; compound control technique; controller design; force control; hard rock tunnel boring machine; trajectory tracking; Equations; Force; Mathematical model; Rocks; Trajectory; Valves;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Guidance, Navigation and Control Conference (CGNCC), 2014 IEEE Chinese
  • Conference_Location
    Yantai
  • Print_ISBN
    978-1-4799-4700-3
  • Type

    conf

  • DOI
    10.1109/CGNCC.2014.7007531
  • Filename
    7007531