• DocumentCode
    1795476
  • Title

    Capacity assignment of the production lines with consideration of equilibrium requirement in iron & steel complex

  • Author

    Bo Zhang ; Yang Yang

  • Author_Institution
    Logistics Inst., Northeastern Univ., Shenyang, China
  • fYear
    2014
  • fDate
    11-13 July 2014
  • Firstpage
    247
  • Lastpage
    250
  • Abstract
    This paper concerns the production line capacity assignment problem with consideration of equilibrium requirement, which sources from the practical production management. The problem is to determine the utilized capacity of each production line in the iron & steel complex in order to make the load of each production line equilibrated and keep the logistics between production lines straightway. To tackle this problem, a mathematical programming model is formulated. Then the quadratic objective function is linearized to obtain a linear programming model which can be optimally solved by CPLEX. Finally, the experiment results based on real operational data have been done to illustrate the efficiency of the algorithm.
  • Keywords
    linear programming; metallurgical industries; production management; quadratic programming; CPLEX; equilibrium requirement; iron and steel complex; linear programming model; logistics; mathematical programming model; production line capacity assignment problem; production management; quadratic objective function; Annealing; Programming; Steel; Iron & steel; equilibrium requirement; linear programming;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    System Science and Engineering (ICSSE), 2014 IEEE International Conference on
  • Conference_Location
    Shanghai
  • Type

    conf

  • DOI
    10.1109/ICSSE.2014.6887943
  • Filename
    6887943