DocumentCode :
1796535
Title :
Refinement/verification of early stage probabilistic software project schedules in the planning stage
Author :
Donghwoon Kwon ; Hammell, Robert J.
Author_Institution :
Dept. of Comput. & Inf. Sci., Towson Univ., Towson, MD, USA
fYear :
2014
fDate :
June 30 2014-July 2 2014
Firstpage :
1
Lastpage :
6
Abstract :
Previous research proposed a framework for the objective and accurate estimation of software project schedules in the proposal preparation stage of large-sized software development projects. A probabilistic approach was used to take into account the uncertainty inherent in the early stage of such projects. This work illustrates how to use the framework in the later planning stage when additional, more detailed information is available via the design documentation. The process continues to use the International Function Point User Group (IFPUG) function point analysis and the International Software Benchmarking Standards Group (ISBSG) regression equations to calculate project size and resource effort, but substitutes the more accurate adjusted function point information for the previously used unadjusted function point data. The use of the proposed framework in the planning stage provides for the reassessment, verification and/or refinement of the estimated schedule produced in the early stage.
Keywords :
formal verification; planning; project management; regression analysis; scheduling; software cost estimation; software management; system documentation; IFPUG function point analysis; ISBSG regression equations; International Function Point User Group function point analysis; International Software Benchmarking Standards Group; design documentation; early stage probabilistic software project schedule refinement; early stage probabilistic software project schedule verification; large-sized software development projects; planning stage; project resource effort; project size; proposal preparation stage; software project schedule estimation; Estimation; Probabilistic logic; Proposals; Schedules; Software; Unified modeling language; Function Point; Probabilistic Schedule Estimation; Software Project Schedule Verification; UML Diagrams;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing (SNPD), 2014 15th IEEE/ACIS International Conference on
Conference_Location :
Las Vegas, NV
Type :
conf
DOI :
10.1109/SNPD.2014.6888712
Filename :
6888712
Link To Document :
بازگشت