DocumentCode
1801680
Title
Optimizing the Multi-UUT Parallel Test Task Scheduling Based on Multi-objective GASA
Author
Rui, Xia ; Mingqing, Xiao ; Jinjun, Cheng ; Xinhua, Fu
Author_Institution
Air Force Eng. Univ., Xi´´an
fYear
2007
fDate
Aug. 16 2007-July 18 2007
Abstract
Parallel test is a new important feature of the future ATS (automatic test system). The optimized parallel test task scheduling is a key problem to the parallel test. In this paper, the genetic algorithm and simulated annealing algorithm are combined effectively to find the multi-UUT (unit-under-test) parallel test tasks array to suffice multiple objectives. The mathematical model and multiple objectives of the multi-UUT parallel test task scheduling are put forward first. Then the gene coding and genetic annealing operating methods are introduced. The result of simulation shows that the algorithm is feasible and efficient.
Keywords
automatic test equipment; genetic algorithms; scheduling; simulated annealing; ATS; automatic test system; gene coding; genetic algorithm; genetic annealing; mathematical model; multi-UUT parallel test tasks; multiple objectives; parallel test task scheduling; simulated annealing algorithm; Automatic testing; Electronic equipment testing; Force measurement; Genetic algorithms; Instruments; Mathematical model; Resource management; Scheduling algorithm; Simulated annealing; System testing; Automatic test system; genetic simulated annealing algorithm (GASA); makespan; parallel efficiency; parallel test; speedup ratio; task scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Electronic Measurement and Instruments, 2007. ICEMI '07. 8th International Conference on
Conference_Location
Xi´an
Print_ISBN
978-1-4244-1136-8
Electronic_ISBN
978-1-4244-1136-8
Type
conf
DOI
10.1109/ICEMI.2007.4351273
Filename
4351273
Link To Document