    Improved projection pursuit method on risk prioritization of barrier lake

  • Author

    Haojin Li ; Junjie Li ; Fei Kang

  • Author_Institution
    Faculty of Infrastructure Engineering, Dalian University of Technology, China
  • fYear
    2013
  • fDate
    1-8 Jan. 2013
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The projection pursuit model projects high-dimensional data into low-dimensional space, and the data could be analyzed conveniently. Considering the affections of length of projection value vector, new projection index function is presented. Using the improved projection pursuit model the subjective affections in risk prioritization of barrier lake could be reduced. The projection values of dam danger and consequence are firstly calculated to describe relative degree of dam danger and consequence respectively. Then their product is used to curve the relative degree of risk, and finally the risk prioritization of barrier lakes could be obtained. Results show that the risk is mainly controlled by the consequence of barrier dam failure and Tangjiashan barrier lake is ranked at the top, consisting with the actual order of removal project.
  • Keywords
    Analytical models; Data models; Floods; Indexes; Iris; Lakes; Vectors; artificial bee colony algorithm; barrier lake; earthquake; improved projection pursuit model; risk assessment;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Conference Anthology, IEEE
  • Conference_Location
    China
  • Type

    conf

  • DOI
    10.1109/ANTHOLOGY.2013.6785038
  • Filename
    6785038