DocumentCode
1807267
Title
Improved projection pursuit method on risk prioritization of barrier lake
Author
Haojin Li ; Junjie Li ; Fei Kang
Author_Institution
Faculty of Infrastructure Engineering, Dalian University of Technology, China
fYear
2013
fDate
1-8 Jan. 2013
Firstpage
1
Lastpage
5
Abstract
The projection pursuit model projects high-dimensional data into low-dimensional space, and the data could be analyzed conveniently. Considering the affections of length of projection value vector, new projection index function is presented. Using the improved projection pursuit model the subjective affections in risk prioritization of barrier lake could be reduced. The projection values of dam danger and consequence are firstly calculated to describe relative degree of dam danger and consequence respectively. Then their product is used to curve the relative degree of risk, and finally the risk prioritization of barrier lakes could be obtained. Results show that the risk is mainly controlled by the consequence of barrier dam failure and Tangjiashan barrier lake is ranked at the top, consisting with the actual order of removal project.
Keywords
Analytical models; Data models; Floods; Indexes; Iris; Lakes; Vectors; artificial bee colony algorithm; barrier lake; earthquake; improved projection pursuit model; risk assessment;
fLanguage
English
Publisher
ieee
Conference_Titel
Conference Anthology, IEEE
Conference_Location
China
Type
conf
DOI
10.1109/ANTHOLOGY.2013.6785038
Filename
6785038
Link To Document