• DocumentCode
    1807759
  • Title

    Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects

  • Author

    Ioannou, Photios G. ; Srisuwanrat, Chachrist

  • Author_Institution
    Dept. of Civil & Environ. Eng., Michigan Univ., Ann Arbor, MI
  • fYear
    2006
  • fDate
    3-6 Dec. 2006
  • Firstpage
    1731
  • Lastpage
    1740
  • Abstract
    The sequence step algorithm addresses for the first time the problem of scheduling repetitive projects with probabilistic activity durations while maintaining continuous resource utilization. This algorithm is based on generalized concepts that can be implemented in most general-purpose simulation systems. The algorithm is presented in detail and is applied to an example project with 7 activities and 4 repetitive units using a simulation model developed in stroboscope, an activity-based simulation system. Numerical and graphical results help explain the algorithm and provide insight into the underlying tradeoff problem between reducing the expected crew idle time and increasing the expected project duration
  • Keywords
    discrete event simulation; project management; scheduling; stroboscopes; activity-based simulation system; continuous resource utilization; general-purpose simulation systems; probabilistic repetitive projects; sequence step algorithm; stroboscope; Buildings; Delay; Floors; Maintenance engineering; Probability distribution; Production; Resource management; Road transportation; Scheduling algorithm; Tunneling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2006. WSC 06. Proceedings of the Winter
  • Conference_Location
    Monterey, CA
  • Print_ISBN
    1-4244-0500-9
  • Electronic_ISBN
    1-4244-0501-7
  • Type

    conf

  • DOI
    10.1109/WSC.2006.322949
  • Filename
    4117807