Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects
Author
Ioannou, Photios G. ; Srisuwanrat, Chachrist
Author_Institution
Dept. of Civil & Environ. Eng., Michigan Univ., Ann Arbor, MI
fYear
2006
fDate
3-6 Dec. 2006
Firstpage
1731
Lastpage
1740
Abstract
The sequence step algorithm addresses for the first time the problem of scheduling repetitive projects with probabilistic activity durations while maintaining continuous resource utilization. This algorithm is based on generalized concepts that can be implemented in most general-purpose simulation systems. The algorithm is presented in detail and is applied to an example project with 7 activities and 4 repetitive units using a simulation model developed in stroboscope, an activity-based simulation system. Numerical and graphical results help explain the algorithm and provide insight into the underlying tradeoff problem between reducing the expected crew idle time and increasing the expected project duration
Keywords
discrete event simulation; project management; scheduling; stroboscopes; activity-based simulation system; continuous resource utilization; general-purpose simulation systems; probabilistic repetitive projects; sequence step algorithm; stroboscope; Buildings; Delay; Floors; Maintenance engineering; Probability distribution; Production; Resource management; Road transportation; Scheduling algorithm; Tunneling;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2006. WSC 06. Proceedings of the Winter
Conference_Location
Monterey, CA
Print_ISBN
1-4244-0500-9
Electronic_ISBN
1-4244-0501-7
Type
conf
DOI
10.1109/WSC.2006.322949
Filename
4117807
Link To Document