Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects
Author :
Ioannou, Photios G. ; Srisuwanrat, Chachrist
Author_Institution :
Dept. of Civil & Environ. Eng., Michigan Univ., Ann Arbor, MI
fYear :
2006
fDate :
3-6 Dec. 2006
Firstpage :
1731
Lastpage :
1740
Abstract :
The sequence step algorithm addresses for the first time the problem of scheduling repetitive projects with probabilistic activity durations while maintaining continuous resource utilization. This algorithm is based on generalized concepts that can be implemented in most general-purpose simulation systems. The algorithm is presented in detail and is applied to an example project with 7 activities and 4 repetitive units using a simulation model developed in stroboscope, an activity-based simulation system. Numerical and graphical results help explain the algorithm and provide insight into the underlying tradeoff problem between reducing the expected crew idle time and increasing the expected project duration
Keywords :
discrete event simulation; project management; scheduling; stroboscopes; activity-based simulation system; continuous resource utilization; general-purpose simulation systems; probabilistic repetitive projects; sequence step algorithm; stroboscope; Buildings; Delay; Floors; Maintenance engineering; Probability distribution; Production; Resource management; Road transportation; Scheduling algorithm; Tunneling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2006. WSC 06. Proceedings of the Winter
Conference_Location :
Monterey, CA
Print_ISBN :
1-4244-0500-9
Electronic_ISBN :
1-4244-0501-7
Type :
conf
DOI :
10.1109/WSC.2006.322949
Filename :
4117807
Link To Document :
بازگشت