Title : 
Study on risk management in CBM project
         
        
            Author : 
Liu Zhi-yong ; Rong Li-qing ; Jia Xi-sheng
         
        
            Author_Institution : 
Management dept., ShiJiaZhuang, HeBei Province, China
         
        
        
        
        
        
            Abstract : 
The frame of risk management system was established and risk analysis was addressed. First, the inherent risk factors in the CBM project were identified based on work breakdown structure method of project management. Then, the technical risks in implementing the CBM project were assessed with the fuzzy synthetic evaluation method and the assessment results were discussed. Finally, risk response measures for risk response were suggested.
         
        
            Keywords : 
condition based maintenance; risk analysis; risk assessment; risk management; risk response;
         
        
        
        
            Conference_Titel : 
Conference Anthology, IEEE
         
        
            Conference_Location : 
China
         
        
        
            DOI : 
10.1109/ANTHOLOGY.2013.6785066