• DocumentCode
    1820538
  • Title

    Decision on maintenance period for power transformer based on Monte Carlo simulation of reliability

  • Author

    Liu, Na ; Gao, Wensheng ; Tan, Kexiong ; Wang, Liufang ; Liang, Guodong ; Li, Wei

  • Author_Institution
    Dept. of Electr. Eng., Tsinghua Univ., Beijing, China
  • Volume
    1
  • fYear
    2003
  • fDate
    1-5 June 2003
  • Firstpage
    479
  • Abstract
    The problem of selecting a suitable maintenance period is vital for preventive maintenance of power transformer. Traditionally, maintenance period can be calculated by model with an objective function, such as availability, maintenance cost, or reliability of the equipment. However, it is difficult to directly apply these models for power transformer, because its reliability is high, and there is no enough reliability data to calculate the objective functions. Therefore, a simulated maintenance period model is developed in this paper. Firstly, Monte Carlo method and Fault Tree method are applied to generate simulated fault times of the transformer system. Secondly, Mission Reliability is calculated based on these simulated data and acts as the objective function in the model. Finally, this model is applied to investigate the maintenance period of power transformer.
  • Keywords
    Monte Carlo methods; fault trees; power system faults; power system reliability; power transformer testing; Monte Carlo simulation; fault tree method; mission reliability; power transformer maintenance period; Availability; Distribution functions; Fault trees; Maintenance; Monte Carlo methods; Power system modeling; Power system reliability; Power system simulation; Power transformers; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Properties and Applications of Dielectric Materials, 2003. Proceedings of the 7th International Conference on
  • ISSN
    1081-7735
  • Print_ISBN
    0-7803-7725-7
  • Type

    conf

  • DOI
    10.1109/ICPADM.2003.1218455
  • Filename
    1218455