DocumentCode
1825194
Title
Real-time scheduling method for steelmaking-continuous casting
Author
Chen, Kai ; Zheng, Zhong ; Liu, Yi ; Gao, Xiaoqiang
Author_Institution
Sch. of Mater. Sci. & Eng., Chongqing Univ., Chongqing, China
fYear
2010
fDate
7-10 Dec. 2010
Firstpage
2366
Lastpage
2370
Abstract
In this paper a real-time scheduling method for steelmaking-continuous casting is proposed to improve the flexibility of scheduling. A directed network model is used to describe steelmaking-continuous casting process considering status of workstations and logistics. First, disturbances including four major kinds are advanced to motivate real-time scheduling in steelmaking-continuous casting process. Second, rescheduling during production process is driven by disturbances mechanism and recalculated by backward and hybrid intelligent algorithm. A real-time scheduling system based on this method is established, and verified by a production plan of eight hours. The result shows that it´s efficient to real plant production.
Keywords
casting; scheduling; steel manufacture; directed network model; production process; real-time scheduling system; rescheduling; steelmaking-continuous casting; Casting; Furnaces; Job shop scheduling; Real time systems; Steel; disturbances; real-time scheduling; steelmaking-continuous casting;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location
Macao
ISSN
2157-3611
Print_ISBN
978-1-4244-8501-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2010.5674363
Filename
5674363
Link To Document