DocumentCode
1825227
Title
Simulation analysis of a multi-item MRP system based on factorial design
Author
Sun, Li ; Heragu, Sunderesh S. ; Chen, Lijian ; Spearman, Mark L.
Author_Institution
Ind. Eng. Dept., Univ. of Louisville, Louisville, KY, USA
fYear
2009
fDate
13-16 Dec. 2009
Firstpage
2107
Lastpage
2114
Abstract
MRP (Material Requirements Planning) has been widely used as a production scheduling system in many companies for at least the past twenty-five years. However, it is a deterministic planning tool, and therefore its ability as an effective planning tool when there is a high degree of uncertainty is questionable. In this study, we develop a multi-item MRP simulation model and design experiments to determine the effects of factors such as forecast errors, process variability and updating on key performance measures. The analysis of variance (ANOVA) results show that these factors affect the inventory and fill rate significantly.
Keywords
inventory management; materials requirements planning; scheduling; deterministic planning tool; factorial design; fill rate; forecast errors; inventory; material requirements planning; multi-item MRP system; process variability; production scheduling system; simulation analysis; Analytical models; Costs; Demand forecasting; Frequency; Job shop scheduling; Materials requirements planning; Predictive models; Production; Safety; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), Proceedings of the 2009 Winter
Conference_Location
Austin, TX
Print_ISBN
978-1-4244-5770-0
Type
conf
DOI
10.1109/WSC.2009.5429655
Filename
5429655
Link To Document