Title :
Incremental temporal reasoning in job shop scheduling repair
Author :
Huang, Y. ; Zheng, L. ; Williams, Brian C. ; Tang, L. ; Yang, H.
Author_Institution :
Dept. of Ind. Eng., Tsinghua Univ., Beijing, China
Abstract :
A working predictive schedule can be useless because of the various external or internal disruptions in a job shop. Total rescheduling may cause problems such as shop floor nervousness. Thus, the job shop scheduling repair (recovery) approach aims at generating a solution satisfying the updated constraints and making deviations minimized. We propose an incremental temporal reasoning approach in this paper to solve job shop scheduling repair problems. Specifically, such a problem is formulated as a disjunctive temporal problem (DTP), framed as an optimal constraint satisfaction problem (OCSP) formally, and finally solved by performing an algorithm integrating incremental temporal consistency and efficient candidate generation. Through involving human interactive mechanism, domain experts can make higher quality decisions by balancing makespan and deviations.
Keywords :
constraint theory; expert systems; job shop scheduling; temporal reasoning; disjunctive temporal problem; domain experts; human interactive mechanism; incremental temporal reasoning approach; job shop scheduling repair approach; optimal constraint satisfaction problem; predictive schedule; shop floor nervousness; Algorithm design and analysis; Artificial intelligence; Cognition; Job shop scheduling; Maintenance engineering; Optimal scheduling; Schedules; Job shop scheduling repair (recovery); constraint-based scheduling; disjunctive temporal problems; incremental temporal reasoning; optimal constraint satisfaction problems;
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location :
Macao
Print_ISBN :
978-1-4244-8501-7
Electronic_ISBN :
2157-3611
DOI :
10.1109/IEEM.2010.5674383