DocumentCode :
1826142
Title :
An effective heuristic considering machine flexibility for parallel machine with eligibility problem
Author :
Huang, R.H. ; Yu, T.H.
Author_Institution :
Dept. of Bus. Adm., Fu Jen Catholic Univ., Taipei, Taiwan
fYear :
2010
fDate :
7-10 Dec. 2010
Firstpage :
1363
Lastpage :
1366
Abstract :
Parallel machine with eligibility scheduling problem is commonly seen in manufacturing industries such as semi-conductor manufacturing. This paper takes flexibility concept into consideration and develops a novel heuristic algorithm to minimize makespan of the problem. Mathematical model is developed as an effectiveness comparison to this algorithm. Data test uses random generated problem with given parameters, and the result shows that proposed algorithm can achieve very close or exact solution to optimality.
Keywords :
manufacturing industries; minimisation; scheduling; eligibility scheduling problem; heuristic algorithm; machine flexibility; makespan minimization; manufacturing industries; mathematical model; parallel machine; random generated problem; semi-conductor manufacturing; Europe; Heuristic algorithms; Job shop scheduling; Parallel machines; Processor scheduling; Parallel machine; eligibility; flexibility; makespan;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location :
Macao
ISSN :
2157-3611
Print_ISBN :
978-1-4244-8501-7
Electronic_ISBN :
2157-3611
Type :
conf
DOI :
10.1109/IEEM.2010.5674398
Filename :
5674398
Link To Document :
بازگشت