Title
"Is my UPS distribution system coordinated?"
Author
Cosse, Roy E., Jr. ; Dunn, Donald G. ; Spiewak, Robert M.
Author_Institution
Powell Electr. Mfg. Co, Houston, TX, USA
fYear
2004
fDate
13-15 Sept. 2004
Firstpage
99
Lastpage
118
Abstract
Typical petroleum and chemical industry UPS (uninterruptible power supply) distribution systems (ANSI/IEEE Std.) are reviewed for interrupting device selectivity during short-circuit conditions. When selectivity is not achieved, alternative solutions are proposed. Distribution system selectivity comparisons are performed for standard circuit breaker panelboards, fuse panelboards and custom panelboards utilizing hydraulic-magnetic circuit breakers. When remote panels are implemented, application considerations include oversizing feeder cables or using step-up/step-down transformers. To determine the "ride through" response of individual operating plant UPS loads, the voltage depression time during UPS distribution system fault clearing is compared with the load "ride through" capability. General guidelines are provided for improved UPS distribution system performance.
Keywords
chemical industry; circuit breakers; electric fuses; petroleum industry; power distribution faults; short-circuit currents; transformers; uninterruptible power supplies; UPS; chemical industry; circuit breaker panelboards; custom panelboards; distribution system; fault clearing; feeder cables; fuse panelboards; hydraulic-magnetic circuit breakers; petroleum industry; short-circuit conditions; step-down transformer; step-up transformer; uninterruptible power supply; Cables; Chemical industry; Circuit breakers; Circuit faults; Fuses; Guidelines; Petroleum; System performance; Transformers; Uninterruptible power systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Petroleum and Chemical Industry Technical Conference, 2004. Fifty-First Annual Conference 2004
ISSN
0090-3507
Print_ISBN
0-7803-8698-1
Type
conf
DOI
10.1109/PCICON.2004.1352786
Filename
1352786
Link To Document