DocumentCode :
1837089
Title :
Impact of design variables on balancing markets
Author :
Frunt, J. ; Kling, W.L. ; Hermans, R.M. ; Nobel, F.A. ; de Boer, W.W.
Author_Institution :
Eindhoven Univ. of Technol., Eindhoven, Netherlands
fYear :
2010
fDate :
23-25 June 2010
Firstpage :
1
Lastpage :
6
Abstract :
In electrical power systems there must always exist a balance between generation and load. Any imbalance will result in a frequency deviation and a deviation from the scheduled cross border exchange. To maintain and restore the balance in a certain area balancing systems exist. Balancing systems based on balance responsibility are affected by several design variables. This article discusses the effect of the programme time unit length and the gate-closure time.
Keywords :
power markets; power system economics; balance responsibility; balancing markets; balancing systems; electrical power systems; frequency deviation; gate-closure time; programme time unit length; Load modeling; Ancillary services; Balance responsibility; Balancing; Gate-closure time; Programme time unit;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Energy Market (EEM), 2010 7th International Conference on the European
Conference_Location :
Madrid
Print_ISBN :
978-1-4244-6838-6
Type :
conf
DOI :
10.1109/EEM.2010.5558680
Filename :
5558680
Link To Document :
بازگشت