• DocumentCode
    1838377
  • Title

    Talking shop - linking training to factory indicators

  • Author

    Wilson, Stephanie

  • Author_Institution
    Intel Corp., Rio Rancho, NM, USA
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    103
  • Lastpage
    106
  • Abstract
    Mean time to repair, mean time to repeat failure/repair, time to first failure after PM (preventative maintenance), and tool availability - the need to link these topics to training and other performance interventions is becoming paramount. How do we know that the time a technician spends in training (or other performance intervention) is worth it? As Intel continuously strives for improvement, departments are asked to prove their impact in terms of business/factory pay-offs. This paper discusses a successful project at Intel in which training was evaluated in terms of equipment indicator improvements, namely: average availability increase across AWX (Automated Wet Station/Bench) tools of 4.25% (which equated ~8 additional hours of production time/week).Variation in availability declined by an average 4.4% across the AWX tools
  • Keywords
    integrated circuit manufacture; personnel; production; training; Intel; automated wet station/bench tools; equipment indicator improvements; factory indicators; mean time to repair; mean time to repeat failure/repair; performance intervention; preventative maintenance; production; technician training; time to first failure; tool availability; Availability; Data engineering; Joining processes; Measurement units; Monitoring; On the job training; Preventive maintenance; Production facilities; Stability; Time measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Symposium, 2001 IEEE International
  • Conference_Location
    San Jose, CA
  • Print_ISBN
    0-7803-6731-6
  • Type

    conf

  • DOI
    10.1109/ISSM.2001.962925
  • Filename
    962925