DocumentCode
1839036
Title
Notice of Retraction
Study on engineering managerial competency and empirical analysis
Author
Wu Wei´e
Author_Institution
Coll. of Zhijiang, Zhejiang Univ. of Technol., Hangzhou, China
Volume
1
fYear
2011
fDate
13-15 May 2011
Firstpage
48
Lastpage
51
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Competitive and complex engineering environment fuel the rise and focus on engineering managerial competency (EMC) of engineering managers. At the beginning, six main elements of EMC were supposed as hypothetical categorization for further empirical analysis. After questionnaire investigating engineering managers across various vocations and industries and data handling, CITC, reliability and factor analysis were made to screen out the right items for measuring EMC Elements and it was found one element should be divided into two dimension as personal trait and mental mode. Later, confirmatory factor analysis (CFA) was conducted, and got a good fit for a seven-factor model for EMC. The elements of capability, managerial behavior, personal traits, and skills take the first four ranks of great effects on EMC of engineering managers, and then mental mode, general qualification and knowledge are subsequent in turn.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Competitive and complex engineering environment fuel the rise and focus on engineering managerial competency (EMC) of engineering managers. At the beginning, six main elements of EMC were supposed as hypothetical categorization for further empirical analysis. After questionnaire investigating engineering managers across various vocations and industries and data handling, CITC, reliability and factor analysis were made to screen out the right items for measuring EMC Elements and it was found one element should be divided into two dimension as personal trait and mental mode. Later, confirmatory factor analysis (CFA) was conducted, and got a good fit for a seven-factor model for EMC. The elements of capability, managerial behavior, personal traits, and skills take the first four ranks of great effects on EMC of engineering managers, and then mental mode, general qualification and knowledge are subsequent in turn.
Keywords
data handling; engineering; management science; reliability; confirmatory factor analysis; data handling; empirical analysis; engineering environment fuel; engineering managerial competency; hypothetical categorization; reliability; Electromagnetic compatibility; Industries; Knowledge engineering; Psychology; Qualifications; Research and development management; confirmatory factor analysis; empirical analysis; engineering managerial competency(EMC); seven competency elements;
fLanguage
English
Publisher
ieee
Conference_Titel
Business Management and Electronic Information (BMEI), 2011 International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-1-61284-108-3
Type
conf
DOI
10.1109/ICBMEI.2011.5916853
Filename
5916853
Link To Document