Two-layer scheduling scheme for pump stations
Author
Cong Cong Sun ; Puig, Vicenc ; Cembrano, Gabriela
Author_Institution
Inst. de Robot. i Inf. Ind., Adv. Control Syst. Group, UPC, Barcelona, Spain
fYear
2014
fDate
8-10 Oct. 2014
Firstpage
1741
Lastpage
1746
Abstract
In this paper, a two-layer scheduling scheme for pump stations in a water distribution network has been proposed. The upper layer, which works in one-hour sampling time, uses Model Predictive Control (MPC) to produce continuous flow set-points for the lower layer. While in the lower layer, a scheduling algorithm has been used to translate the continuous flow set-points to a discrete (ON-OFF) control operation sequence of the pump stations with the constraints that pump stations should draw the same amount of water as the continuous flow set-points provided by the upper layer. The tuning parameters of such algorithm are the lower layer control sampling period and the number of parallel pumps in the pump station. The proposed method has been tested in the Richmond case study.
Keywords
discrete systems; network theory (graphs); on-off control; predictive control; pumping plants; sampling methods; scheduling; water supply; MPC; ON-OFF control operation sequence; continuous flow set-points; discrete control operation sequence; lower layer control sampling period; model predictive control; one-hour sampling time; pump stations; two-layer scheduling scheme; water distribution network; Accuracy; Mathematical model; Optimal scheduling; Scheduling; Scheduling algorithms; Vectors;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Applications (CCA), 2014 IEEE Conference on
Conference_Location
Juan Les Antibes
Type
conf
DOI
10.1109/CCA.2014.6981564
Filename
6981564
Link To Document